中科院脑科学与智能技术卓越创新中心神经所研究组组成

 

International Business Machine is Using Technology to help Xinjiang Genocide and Crime Against Humanity

 As stated in the bond prospectus of Karamay City Construction Investment Development Co.,Ltd (KCCID) signed off by KCCID on 29 December 2021, KCCID has accelerated the promotion of China Mobile (Xinjiang) Data Center, Huawei Cloud Service Data Center, Autonomous Region Information System Disaster Recovery Center to perform in-depth application and attracted the National "Sky Map" Data Disaster Recovery Center, Xinjiang Autonomous Region Data Disaster Recovery Center, Western Satellite Network, Huawei Global Cloud Computing Center, IBM Joint Innovation Center, HP Global Technology Consulting Service Implementation Center and other major projects.




PetroChina: In 1993, Karamay Oilfield proposed to build a digital oilfield. In 2006, the problem of normalization of data management was solved; in 2007, the problem of data integration application was solved; in 2008, a computer network covering an oil area of 130,000 square kilometers and a backbone bandwidth of 1,000 megabytes was built. On 10 April 2012, "Sky Map", known as Chinese counterpart to Google Maps, settled in Karamay; on 27 August 2012, IBM entered Karamay;

IBM is the world's largest information technology and business solutions company with a century-old history. IBM believes that a smart oil field should be an oil field that can fully sense, automatically manipulate, predict trends and optimize decision-making. IBM can provide innovative and effective methods to optimize production in terms of information technology to build intelligent oilfields. With innovative technology, oilfields can make scientific decision-making, optimized management, automatic execution, real-time monitoring and integrated collaboration, so as to promote the construction of intelligent oilfields and help the transformation of oil cities. 

After officially entering Karamay, IBM said would use the concept of smart city, global practical experience and innovative technology to help build a smart industrial park, cultivate information technology talents, support Karamay's development of the information industry; help Karamay build a cloud computing center, and use cloud computing to help business models , industry models and the driving ability of regional economic reforms to fundamentally promote the construction of smart Karamay.

On 18 October 2012, the Western Satellite Application Industrial Park, the intelligent perception and location service system based on Beidou navigation technology, and the "Aerospace Neighbor" IoT data application service platform signed contracts in Karamay. On 3 September 2014, China Mobile's cloud computing data center with a total investment of more than 2 billion yuan settled in Karamay, and Huawei, IZP, ZTE, Lenovo, Hewlett-Packard, Neusoft...flocked to it.

China Mobile Xinjiang Cloud Computing and Big Data Center in Karamay Cloud Computing Industrial Park, and the exterior view of Huawei Cloud Service Data Center in Karamay Cloud Computing Industrial Park



Construction of Xinjiang Disaster Recovery Center: According to the requirements of the Communist Party of China for disaster backup/recovery of important information systems, the construction of a centralized and unified important information system remote disaster backup center is an important guarantee for maintaining stability. The total investment IRR of the project is estimated to be 9.5%, and the total investment is 730 million. The project is located in the area of the original scientific research and production office base of Xinjiang Oilfield Company, behind the production dispatch command center building.

It was a part of Karamay Regional Digital Network Control Center. Karamay Regional Digital Network Control Center project includes:

Intelligent Xinjiang Oilfield Construction

CNPC Xinjiang Regional Data Center Construction

Digital Karamay City Construction

Construction of Xinjiang Disaster Recovery Center

Construction started in July 2011. Approval document: Kefa Gaifa [2010] No. 516, and land use approval document: Xinke Guotu Yushenzi [2010] No. 195. At the end of 2016, there were 156 million yuan cloud computing industrial parks under construction at the end of 2016, 20 million for a 110kv power supply system, 308 million for Huawei cloud service data center.

 Audited 2017 Financial Statements: 308 million Huawei Cloud Service Data Center under construction has been transferred to investment properties. Construction in progress at the end of 2017: 215 million cloud computing industrial park, 240 million public safety project, 300 million Karamay Medical Base.



The land area of the Data control center is 56,000 m2, the land area of the Huawei Cloud Service Center is 22,000 m2, the first phase of the cloud computing industrial park A02 area is 27,000 m2, and the second phase office building of the cloud computing A02 covers an area of 6,000 m2. None of the buildings has valid real estate certificate. The Karamay Army Reserve Engineer Corps equipment depot and bathhouse project completed in 2016 was 8.35 million.

Investment properties details of KCCID in March 2021 at gross value: Data Control Center 1.13 billion (land price 1550 yuan/m2), Huawei Cloud Service Center 410 million, Cloud Computing Industrial Park A02 Block Building and Landscape Phase I 210 million, Cloud Computing A02 Phase II 60 million office buildings (the last three land prices are 640 yuan/m2).



Genocide and crime against humanity has been ongoing in Xinjiang. Despite the circumstances, IBM didn't withdraw investment in Xinjiang and didn't withdraw all the investment in China. IBM is helping China commit genocide and crime against humanity with its big data technology.

All the employees of IBM that are still in China shall be sanctioned. So be the HP's employees in China.




美国联邦企业所得税填报方法

 2021版美国联邦企业所得税申报表:下载链接

税务年度

2021版申报表适用于2021自然年度或2021年开始的会计年度。

除了从事专业服务的股东也是雇员的个人服务公司以外,其他所有企业可以用会计年度或自然年度作为报税年度。

变更税务年度,需要事先得到IRS同意。

纳税申报义务人

除非适用第501条豁免,所有美国国民公司都应该申报,无论是否产生了应纳税所得。

但是不一定都申报F1120表格,不申报1120的组织及具体需要填报的表格如下




不是必须申报1120表格但选择申报1120表格的企业,需要填8832表

依据州法律成立的有限责任公司,股东数大于1人的,在申报联邦所得税时通常被视作合伙企业,填报1065表。股东数为1人的,在股东个人的申报表中申报,不填1120表。这类公司只有填了8832表,才能按1120表申报。农业企业应申报1120表。

申报期限

税务年度结束后的第4个月的第15日以前。但是税务年度结束日为6月的,税务年度结束后的第3个月的第15日。如果需要延长申报期限,填写7004表



生物医学影像中心(张江国际脑影像中心)核心人员

 Wang et al. (2019). High-Field MR Diffusion-Weighted Image Denoising Using a Joint Denoising Convolutional Neural Network. J Magn Reson Imaging.

Yang et al. (2019). IMAge/engine: a freely available software for rapid computation of high-dimensional quantification. Quant Imaging Med Surg.

Chen et al. (2017). The value of MRI in evaluating the efficacy and complications with the treatment of intra-arterial chemotherapy for retinoblastoma. Oncotarget.

Wang et al.(2016). Noninvasive measurement of renal oxygen extraction fraction under the influence of respiratory challenge. J Magn Reson Imaging.

Sui et al. (2015) . Differentiation of Low- and High-Grade Pediatric Brain Tumors with High b-Value Diffusion-weighted MR Imaging and a Fractional Order Calculus Model. Radiology.

研究方向:方向一:生物医学影像技术研发

磁共振新成像序列、重建技术、脑结构及功能成像、神经影像、波谱技术、医学图像后处理等。

方向二:分子影像学研究

脑损伤与修复的磁共振分子影像学研究;缺血性脑卒中的分子机制研究;肿瘤血管生成的分子显像;纳米磁颗粒定量成像;分子探针的研发与应用等。

方向三:磁共振技术应用

语言理解、注意和视知觉等脑认知功能的fMRI研究、神经结构影像动物模型、大脑生命周期及老龄化结构及功能影像、脑疾病如抑郁症、精神分裂症等相关研究。

方向四:影像辅助诊断

基于多模态影像的疾病诊断方法研究,包括脑卒中、脑肿瘤、肝癌、乳腺癌、胰腺癌等。



Ad1